Floor area and number of pieces
The more fixed elements and bespoke furniture a project has, the more design and fabrication it takes. A single counter and the full fit-out of a room don't cost the same, even at equal floor area.
Materials and finishes
Solid wood, veneer, laminate, metal or stone don't cost the same, and don't age the same way. Finishes (lacquer, varnish, patina) weigh in too: they decide the look and how the piece holds up.
Site constraints
An upper floor with no goods lift, an occupied site, a shopfront to preserve, the rules of a public venue (fire behaviour of materials, accessibility): these constraints affect the install, and sometimes the design itself.
The timeline
A tight schedule can call for more workshop capacity. A realistic timeline, decided early, leaves room to optimise both the fabrication and the budget.
How we build a quote
We cost after a visit to the premises and a look at your plans. The quote, detailed item by item and approved before we start, keeps surprises out of the project.